Solar Vendor Scams and Delays: How to Choose a Safe Installer under PM Surya Ghar

Last updated: 21 October 2026

Short answer: Use only a vendor that appears on the official portal for your area, and check that they have not been deactivated. Get a written agreement that names the system size, the panel and inverter make and model, the price, the warranty, the five-year maintenance and a completion date. Never pay anyone a fee to “process” your subsidy, because it is paid straight into your bank account. Pay in stages, keep every paper, and if work stalls, complain on the portal.

Problems with installers are real, and the government has started acting on them. In August 2026 MNRE deactivated 66 vendors for one month because they were holding far more consumer applications than they could install. In June 2026 it also issued a complaint procedure that can lead to a vendor being deactivated.

This guide is about general warning signs, not any particular company. Most installers do honest work. The aim here is to help you pick one of them, spot trouble early and know your rights if something goes wrong.

In this guide:

What your vendor must give you under the scheme

Before looking at the bad cases, know the baseline. Under the scheme’s rules and guidelines, a registered vendor is expected to do the following:

What you should get Details
Clear pricing REC’s vendor guidelines say all charges, taxes and fees must be stated clearly, with no hidden costs.
Equipment that meets the rules Systems must meet MNRE’s minimum technical and quality standards, and the electricity company checks them at inspection.
Safety checks before handover The vendor must carry out safety checks before the system is handed to you.
Five years of free maintenance Applies across India. MNRE has told Parliament that the vendor must maintain the plant for five years from the date of commissioning, and REC’s guidelines say the repairs and maintenance must be free of charge. State portals repeat it, for example Delhi’s, which says the vendor covers cleaning and all-inclusive maintenance and fixes faults at its own cost.
A five-year warranty on the system REC’s guidelines say the vendor must give a system warranty certificate covering all components for five years from commissioning. In October 2026 MNRE also said the manufacturers’ warranty documents must carry the serial numbers of your modules and inverter.
A service helpline REC’s framework requires vendors to run a post-installation helpline and to tell you the time limits for resolving complaints.
Module warranty MNRE has set a minimum 10-year product warranty and a 25-year power output warranty for solar modules under schemes including PM Surya Ghar.
Your own copies of warranties You should receive and keep all the guarantee and warranty papers. Inverters usually carry about 5 to 7 years.

These points come from the national scheme guidelines, so they apply to every registered vendor in every state. A few details, such as who inspects the plant and how complaints are handled, can vary by electricity company, so it also helps to read your own state’s page.

A vendor who fails these standards can be de-registered and penalised. If a vendor offers less than this, or tries to charge you extra for basic maintenance in the first five years, treat that as a warning.

What actually goes wrong

Here is each problem with the quickest way to avoid it, and what to do if it has already happened. The sections after this explain every fix in detail.

Problem What it looks like How to avoid it If it has already happened
Vendor not registered You install first, then find the vendor is not on the portal. Electricity companies have warned that homes with unregistered vendors do not get the subsidy. Check the vendor on the portal before you pay. See how to check a vendor. Ask the electricity company whether a registered vendor can take over the inspection and paperwork, and file a complaint if you paid.
Fake subsidy agents Someone offers to “process” or speed up your subsidy for a fee, or pretends to be from the government. Never pay a subsidy fee. Read the red flags. Stop paying, keep the proof, and report it to 1930 or cybercrime.gov.in if you paid online.
Applications held back The vendor takes your booking but does not install. MNRE described this as hoarding of applications. Ask how many jobs are pending, and get a completion date in the agreement. Ask for a date in writing, then complain on the portal if more than 60 days pass. See delays.
Poor or wrong equipment Components that do not match the agreement or the scheme’s rules, missing earthing or surge protection, or serial numbers that do not match. Get the make, model and DCR certificate number in writing, and do the equipment checks. Photograph the problem, write to the vendor, and file a portal complaint. Equipment defects are covered by the MNRE complaint procedure.
Paid but unfinished An advance or full payment is taken and the installation stays incomplete. Pay in stages, to the company’s account, as set out in how to pay safely. Send the written complaint message below, then use the portal, the consumer helpline and, for fraud, the police.
No paperwork No written agreement, no warranty papers and no certificates. Do not pay without a signed agreement. See what to get in writing. Ask in writing for the documents. Vendors must provide warranty papers, and missing ones can be complained about.
No support after installation Nobody picks up the phone when the inverter shows a fault in the first five years. Put the five-year maintenance and a service number in the agreement. Write to the vendor, then file a portal complaint, since free maintenance is part of the scheme. See after installation.
Delays that are not the vendor’s fault Slow feasibility, inspection or net meter work at the electricity company. Know the usual waits, and have the vendor book the inspection as soon as installation ends. Write to the electricity company’s division office with your application number. See delays.

Several of these (unfinished work after payment, missing warranties and certificates, delays after advance payments and equipment mismatches) are named as violations in the MNRE complaint procedure.

Four common scenarios

These are illustrations of how problems usually start, not reports about any one company.

1. The “processing fee”. A caller or agent says your subsidy will take months, but for a fee they can push it through. Nothing about the scheme works that way. The subsidy is credited to your bank account after installation and inspection, and a fee only moves money from you to the agent.

2. The booking that goes nowhere. A vendor collects advances and agreement papers from many households at once, far more than its crew can install. Your application sits in “agreement uploaded” for months. This is the pattern MNRE acted on in August 2026, when it found some vendors had far more pending applications than their installation record could justify.

3. The cheap quote with the wrong panels. One quote is much lower than the rest. The panels turn out not to meet the domestic content rules, and your subsidy file is queried at inspection. Industry guides say modules that meet the domestic content requirement cost roughly 10 to 18 per cent more than ordinary Indian-assembled ones, so a very low price should make you ask why.

4. The vendor who vanishes after commissioning. The system works at first, but the inverter fails in year two and the vendor no longer answers. This is why the five-year maintenance promise should be in your agreement in writing, along with a service number.

How to check a vendor before you sign

  1. Find them on the portal. Log in to pmsuryaghar.gov.in, choose your state and electricity company, and open the vendor selection page. If the vendor is not listed, do not go ahead, whatever they tell you.
  2. Pick vendors who are still active. Deactivated vendors are removed from the vendor-selection page, and MNRE has said their names are to be shown on the portal. Check again on the day you choose.
  3. Ask about their workload. How many homes did they finish in the last three months, and how many bookings are pending? A long pending list with few completions is a delay risk. MNRE has advised vendors not to hold applications for more than 60 days without a valid reason.
  4. Visit a finished installation. Ask for two recent homes in your area. Call or visit the owners and ask how long it took, whether the subsidy arrived, and whether the vendor picks up the phone.
  5. Check the company itself. Ask for the company’s name, address, GST number and a landline or office you can visit. Check that the name on the quote matches the name on the portal.
  6. Get at least three quotes. Use the solar quote checker to see whether a price is fair for your system size.
  7. Ask for a site visit. A serious vendor looks at your roof, shade, load and wiring before quoting. A quote given on WhatsApp without seeing the house is a guess.
  8. Read the agreement before you pay anything. See “What to get in writing” below.
  9. Apply on the portal first. Always apply and wait for approval before installation starts. Our step-by-step application guide shows each stage.

A quick scorecard

Check What good looks like Walk away if
Portal listing Listed for your state and electricity company Not listed, or “registration in process”
Workload Completes steadily, honest about pending jobs Cannot or will not say how many jobs are pending
References Gives local addresses you can visit Only online reviews, or no references
Quote Itemised, with kW, make and model One lump sum with no details
Agreement Signed, with dates and warranty “We will do it verbally”
Payments Staged, by bank transfer to the company Cash, personal account, or full amount upfront
After-sales Names a service contact for five years No service number or vague promises

Questions to ask every installer

Ask these on a call or visit and note the answers. A good vendor answers calmly and in writing. A weak one gets defensive.

Company and track record

  • Are you registered on the portal for my electricity company? What is your registration number?
  • How many systems have you finished in the last three months, and how many are pending?
  • Can I speak to two customers near me?

Equipment

  • What are the exact make, model and wattage of the panels and the inverter?
  • Do the panels meet the domestic content requirement, and what is the DCR certificate number?
  • Which safety certificates do the panels and the inverter hold?
  • What earthing, surge protection and isolation devices are included?

Money and timing

  • What is the total price including GST, and what does it include?
  • Who pays for the net meter and its testing?
  • When will you start and finish after the feasibility approval?
  • What is the payment schedule?

After installation

  • Who do I call for faults in the first five years, what is your helpline number, and how fast will you respond?
  • Is cleaning and maintenance free for five years?
  • What happens if the subsidy is delayed or rejected because of an error on your side?

Checking the equipment

You do not need to be an engineer. A few simple checks protect you from most equipment problems.

Panels

  • Do the arithmetic. Panel count times wattage should equal the system size in the quote. Six panels of 550 W make 3.3 kW. Six panels of 400 W make only 2.4 kW. Ask for the total kW in writing, and compare it with what you need using our guide on how much solar you need.
  • Domestic content. The scheme’s portal now takes a 16-digit DCR certificate number from the vendor and fetches the module serial numbers automatically. Ask for that certificate number and the serial number list.
  • Match the stickers. Before inspection, check that the serial numbers on the panels at your house match the list. In May 2026 MNRE also ended the option for vendors to file an undertaking when serial numbers are repeated, so mismatches can now hold up an application.
  • ALMM and DCR are different. A module can be Indian-assembled and still not meet the domestic content rule. Ask the vendor to confirm both.

Inverter

  • Ask for the make, model, capacity and warranty period. A shorter warranty is normal, since inverters usually carry about 5 to 7 years.
  • Plan for the cost. Guides suggest you may need to repair or replace the inverter once during the panels’ life, so ask what an extended warranty would cost.

Structure, wiring and safety

  • Is the mounting structure fixed securely to your roof, and does it avoid water tanks and shade?
  • Are the cables properly protected, with earthing and surge protection fitted?
  • Does the system have isolation switches and boxes where required?

On installation day

  • Photograph the panels, the inverter label, the serial stickers and the wiring.
  • Check that the work matches the quote. If anything is swapped, ask for it in writing before you accept it.

Comparing quotes properly

Do not compare only the final price. Here is an illustrative example with made-up numbers for a home that needs about 3 kW:

Quote A Quote B Quote C
Price ₹1,85,000 ₹1,45,000 ₹1,95,000
System size 3.3 kW 2.4 kW 3.3 kW
Panels 6 x 550 W, DCR 6 x 400 W, no DCR proof 6 x 550 W, DCR
Price per kW About ₹56,000 About ₹60,000 About ₹59,000
Maintenance 5 years free, in writing “We will see” 5 years free, in writing
Net meter and paperwork Included You handle it Included
Completion date In writing None In writing

Quote B looks cheapest, but it is the smallest system, it has no domestic content proof, and it leaves out the paperwork and maintenance. Per kW it is not even cheaper. Only A and C are real candidates, and the choice between them comes down to references and after-sales support. Put your own quotes into the solar quote checker, and check what each system would save using the rooftop solar calculator.

Red flags that should make you walk away

  • A fee to “process” the subsidy. The subsidy is paid directly to your bank account after commissioning, so no agent needs to be paid for it.
  • Claims to be from the government or MNRE. Installers are private companies, and officials do not sell systems.
  • Pressure and false deadlines. “The subsidy ends this month, pay today” is a common pitch. There is no official notice that it ends on a fixed date in March 2027.
  • Not on the portal list, or “registration is in process”.
  • Install first, apply later. The scheme expects you to apply and get approval first.
  • Full payment upfront, cash only, or payment to a personal account instead of the company’s account.
  • No written agreement or warranty papers.
  • Vague answers about the panel brand, model or wattage.
  • A price much lower than every other quote, with no clear reason.
  • A quote without a site visit.
  • No office, no address, or only a mobile number.
  • Refusal to give the DCR certificate number or the serial numbers.

What to get in writing

Do not rely on promises on a call or in a chat. Ask for a signed agreement or quotation that includes:

  • Total price, with GST, and exactly what it includes (panels, inverter, structure, wiring, earthing, surge protection, net meter work and testing).
  • System size in kW, and the make, model and wattage of the panels and inverter.
  • The DCR certificate number and the module serial numbers.
  • A start date and a completion date, and what happens if the vendor misses them.
  • The payment schedule, in stages.
  • Warranty periods for panels, inverter and workmanship, and who to call for service.
  • The five years of free cleaning and maintenance.
  • Who handles each portal step: feasibility, net meter, inspection and commissioning papers.
  • Who pays for the net meter. Some electricity companies ask the consumer to pay the meter cost, so settle this before you sign.
  • What happens if the subsidy is rejected because of a vendor’s mistake.

Sample wording you can adapt (this is a starting point, not legal advice):

The vendor will complete installation, testing and submission of all commissioning documents within ___ days of feasibility approval. If the vendor fails to do so for reasons within its control, the customer may cancel and receive a refund of all amounts paid within ___ days.

The vendor will provide free cleaning, repair and maintenance for five years from the date of commissioning, and will respond to a fault complaint within ___ working days.

If the subsidy is rejected or reduced because of an error by the vendor, including wrong documents or equipment that does not meet the scheme’s requirements, the vendor will correct it at its own cost or refund the difference.

How to pay safely

We could not find an official limit on how much advance a vendor can take, so use sensible habits:

  • Pay in stages tied to milestones instead of paying everything upfront.
  • Pay by bank transfer to the company’s business account, not cash and not a personal account.
  • Ask for a receipt and a GST invoice for each payment, and keep them all.
  • Expect to pay the full cost first. The subsidy comes later, after inspection, so do not agree to anything that depends on you paying “subsidy charges”.
  • If you use a loan, confirm in writing what the vendor will do and when the bank releases the money. Banks have rejected many loan applications, so do not start work before the loan is sanctioned.

An example of a staged schedule you could discuss with a vendor (illustrative only, not an official rule):

Stage Example share
On signing the agreement A small booking amount
After feasibility approval and equipment delivery A larger part
After installation and inspection A smaller balance
After the net meter and commissioning papers The final balance

The point is that the last payment should only go out when the system is working and the paperwork is complete.

Delays: is it the vendor or the electricity company?

Not every delay is the installer’s fault. Reports have described slow feasibility checks and meter delays at electricity companies, including meter availability problems. The portal dashboard tells you where you are stuck:

Stage Who controls it What guides report If you are stuck
Booking and agreement Vendor Should move within days Ask the vendor for a written start date. Complain if more than 60 days pass with no valid reason.
Feasibility approval Electricity company About 7 to 30 days in many guides, much longer in some states Contact the local office with your application number.
Installation Vendor Often a few days to two weeks for a home Ask for the delivery date of materials and a crew date in writing.
Inspection Electricity company About 5 to 30 days or more Ask your vendor whether the inspection has been requested. Escalate in writing.
Net meter and commissioning Electricity company From about a week to several months Write to the division office with the installation date.
Subsidy credit Government, through the bank Roughly 15 to 45 days after commissioning Check bank linking and the dashboard.

Waits also differ a lot between states. One installer-side tracker for the second quarter of 2026 reported average feasibility waits of about 9 days in Gujarat against about 47 in Uttar Pradesh. A 2024 circular from Maharashtra’s electricity company told its offices to complete the agreement, meter installation and commissioning within 15 days of the installation certificate, so check what your own company has promised. Installer guides put the whole journey at roughly two to four months, so a few weeks of waiting at one stage is not unusual.

What to do about delays

  1. Ask the vendor in writing for a date and the reason for the delay.
  2. If the application has sat with the vendor for more than 60 days without a valid reason, file a complaint on the portal.
  3. For approval, inspection or meter delays, write to your electricity company’s division office. Include your application number and the installation date, and keep a copy.
  4. If the vendor is not chasing the inspection, ask them to book it the day installation is complete.
  5. Ask the portal support or your electricity company whether you can change vendor at your stage, because the rules can depend on how far the application has gone.

What to do if something goes wrong

  1. Write to the vendor. Send an email or message with dates, photos and what you want fixed. Give a reasonable deadline.
  2. File a grievance on the portal. Under the MNRE procedure, the vendor is asked to explain within eight days, then gets a reminder and a show-cause notice. If there is still no answer or no acceptable one, the vendor can be deactivated for a month. Complaints can cover poor installation, safety, payments, paperwork and after-sales service.
  3. Contact your electricity company for approval, meter and inspection problems.
  4. File a consumer complaint. Call the National Consumer Helpline on 1915 or use consumerhelpline.gov.in.
  5. Report fraud. If you paid online and were cheated, call 1930 or report at cybercrime.gov.in, and for a large loss file a written complaint at your local police station. These routes are listed in a vendor-verification guide as the usual ones.

A short complaint message you can adapt:

Subject: Complaint about delay in my PM Surya Ghar installation, application no. ______

I booked a ___ kW system with your company on ___ and paid ₹___ on ___. As of today, the work is ___ (not started / incomplete / not commissioned). Please send me a written reply within 8 days explaining the delay and giving a firm completion date. If I do not receive a reply, I will file a complaint on the PM Surya Ghar portal and with the consumer helpline. Attached are my agreement, payment receipts and photos.

Keep every message, receipt, photo and the agreement. They are your proof.

After installation: keep these papers and watch the output

Once the system is running, put these in one folder, on paper and on your phone:

  • The agreement and the final invoice, with GST
  • Payment receipts
  • Warranty papers for the panels and the inverter, with the serial numbers printed on them
  • The operation and maintenance manual covering the main parts of your plant
  • The module and inverter serial numbers and the DCR certificate number
  • The commissioning report and the net meter agreement
  • Photos of the installation
  • The vendor’s service contact for the five-year maintenance

Then check that the system is producing what it should. After a few weeks, compare your actual output with the estimate using our solar performance check. If it is far below, ask the vendor to inspect it in writing, since the five-year maintenance is meant to cover this. Keep the panels clean, and ask your insurer whether the system can be covered for theft, damage and weather.

Frequently asked questions

How do I check if a PM Surya Ghar vendor is genuine?

Open the vendor selection page on pmsuryaghar.gov.in for your state and electricity company, and confirm the vendor is listed. Then check their recent work, ask for references, visit a finished installation and get a written agreement.

Do I have to pay anyone to get the subsidy?

No. The subsidy is credited to your bank account after installation and inspection. Anyone asking for a fee to process or speed it up is a red flag.

How much advance should I pay the vendor?

We could not confirm an official limit. Ask for staged payments linked to milestones, pay to the company’s account and keep receipts.

Is maintenance really free for five years?

Yes. The scheme requires every registered vendor to maintain the plant for five years from commissioning, and the REC guidelines say repairs and maintenance must be free of charge. Put it in your agreement, with a service number, because it is much easier to enforce when it is written down.

What if my vendor gets deactivated after I signed?

MNRE has said that deactivated vendors keep portal access to complete their existing installations, but cannot accept new applications. Ask the vendor for a written completion date and keep the pressure on in writing.

Can I complain about poor installation or missing warranty papers?

Yes. The MNRE complaint procedure covers installation quality, safety, warranty and certification documents, and after-sales service.

Why is my application stuck for months?

It could be the vendor, the electricity company or the bank link. Check the stage on your dashboard. If the vendor is holding the file, complain on the portal. If it is waiting for approval, inspection or a meter, write to the division office.

Should I choose the cheapest quote?

Not automatically. Compare the kW, the equipment, the paperwork and the support included, and use the solar quote checker. A very low price often hides a smaller system or missing items.

Should I rush because the subsidy is ending?

No. Rushing is how people end up with a bad vendor. See what is confirmed and what is only reported about the end date.

Before you sign: checklist

  • The vendor is listed on the portal for my state and electricity company.
  • The vendor is not deactivated, and I have seen or called a recent customer.
  • I have three written quotes, compared with the solar quote checker.
  • The agreement names the kW, equipment make and model, DCR certificate number, warranty, five-year maintenance and completion date.
  • Payment is in stages to the company’s account, with GST invoices.
  • It is clear who pays for the net meter and who handles each portal step.
  • Nobody has asked me for a subsidy processing fee.
  • I will not start installation until the portal shows approval.

Sources

Rules can change. Always verify the latest information on the official website: pmsuryaghar.gov.in

This post describes general warning signs and is not about any specific company. The quote example uses made-up numbers for illustration. SolarYieldPro gives planning estimates only. This is not legal or financial advice.