PM Surya Ghar Last Date: Scheme Closes on 31 March 2027 (Official Confirmation)

Last updated: 23 October 2026

Short answer: The official PM Surya Ghar portal (pmsuryaghar.gov.in) now shows a live countdown with the line “Scheme closes on 31 March 2027.” As of 23 October 2026 there were 159 days left. The ₹78,000 central subsidy is still available today, but only for a limited time.

If you are planning rooftop solar for your home, this changes the advice. Earlier, March 2027 was only known as the government’s target for one crore installations. It is now the date the scheme officially closes, and the safest plan is to have your system installed and commissioned well before it.

In this guide

  1. What the government has confirmed
  2. The key dates at a glance
  3. Is the last date for application or commissioning?
  4. How much subsidy you can get
  5. What the subsidy is worth in rupees
  6. Who is eligible
  7. Documents you need
  8. The process in short
  9. Plan backwards from the deadline
  10. The new 70% confidence-score rule
  11. Loans, state top-ups and housing societies
  12. Will the scheme be extended?
  13. Mistakes that can cost you the subsidy
  14. Questions to ask your installer
  15. Frequently asked questions

What the government has confirmed

Claim Status Source
Scheme launched 13 February 2024 Confirmed PIB
Scheme closes on 31 March 2027 Confirmed (official portal homepage, checked 23 Oct 2026) pmsuryaghar.gov.in
Target of one crore households Confirmed PIB
Subsidy of ₹30,000 for 1 kW, ₹60,000 for 2 kW and up to ₹78,000 for 3 kW and above Confirmed PIB
93.2 lakh applications, 53.65 lakh rooftop installations and 63.5 lakh households benefitted (as on 22 Oct 2026) Confirmed (portal figures, updated daily) pmsuryaghar.gov.in
FY27 target of 39 lakh systems, about ₹22,000 crore allocated Reported Business Standard
Extension of 3–4 months under consideration Unconfirmed EQ Magazine
Successor scheme for rural areas, batteries and financing Unconfirmed EQ Magazine

Many installer websites have said “31 March 2027 is the last date” for months without linking to any official source. That has changed: the date is now on the government’s own portal. Still, treat anything beyond that date (an extension, a new scheme) as rumour until the government announces it.

The key dates at a glance

Date What happens
13 Feb 2024 Scheme launched
3 Sep 2026 New rule: applications with a confidence score below 70% need an undertaking and ID proof before redemption
23 Oct 2026 Official portal shows 159 days left
31 Dec 2026 Our recommended date to have your system commissioned
31 Mar 2027 Official closing date of the scheme

Is the last date for application or commissioning?

This is the most important unanswered question. The portal homepage says the scheme closes on 31 March 2027, but it does not explain whether that date applies to:

  • the date you apply on the portal, or
  • the date your system is installed, inspected and commissioned.

The subsidy is paid only after commissioning and after you upload your bank details. So the cautious approach is to treat commissioning as your real deadline. If the rule turns out to be more relaxed, you lose nothing. If it is strict, you keep your ₹78,000.

Ask your installer to confirm in writing what happens to your subsidy if commissioning slips past the closing date.

How much subsidy you can get

The central subsidy depends on system size. It is capped at 3 kW, so systems larger than 3 kW get the same maximum.

System size Central subsidy Subsidy per kW
1 kW ₹30,000 ₹30,000
2 kW ₹60,000 ₹30,000
3 kW ₹78,000 ₹26,000
4 kW ₹78,000 ₹19,500
5 kW ₹78,000 ₹15,600

The official guidance links the subsidy to your monthly consumption:

  • 0–150 units a month: a 1–2 kW system, with a subsidy of ₹30,000–₹60,000
  • 150–300 units a month: a 2–3 kW system, with a subsidy of ₹60,000–₹78,000
  • Above 300 units a month: a system above 3 kW, with a subsidy of ₹78,000

A 3 kW system is the sweet spot for many homes because it is the smallest size that earns the full ₹78,000. If you are not sure what size you need, read How much solar do I need for my house?

What the subsidy is worth in rupees

These figures are illustrative averages using a gross cost of about ₹60,000 per kW and yearly savings of about ₹10,000 per kW. Your real numbers depend on your tariff, roof, state and installer quote.

System Gross cost Subsidy Net cost Payback with subsidy Payback without subsidy
2 kW ₹1,20,000 ₹60,000 ₹60,000 about 3 years about 6 years
3 kW ₹1,80,000 ₹78,000 ₹1,02,000 about 3.4 years about 6 years
5 kW ₹3,00,000 ₹78,000 ₹2,22,000 about 4.4 years about 6 years

What this shows: the subsidy matters most for small and medium home systems. For a 3 kW system, missing it adds about 2.6 years to your payback period and costs ₹78,000 outright.

For your own numbers, enter your electricity bill into our free rooftop solar calculator.

Who is eligible

The scheme is for residential rooftop solar. In general you need:

  • to be an Indian citizen who owns a house with a roof suitable for solar panels
  • a valid electricity connection and consumer number in your name
  • no earlier central subsidy for solar on the same household
  • panels and equipment from approved sources (ALMM-listed panels are required under the scheme)
  • to install through a vendor registered with your electricity company (DISCOM)

Only one central subsidy is allowed per household. If you already received subsidy under the older rooftop solar scheme, you are not eligible again. Always check the exact current conditions on the official portal, as your state or DISCOM may apply extra requirements.

Documents you need

Keep these ready before you register:

  • Electricity consumer number and a recent electricity bill
  • Registered mobile number and email address
  • Bank account details and a cancelled cheque (for the subsidy transfer)
  • Government ID such as Aadhaar or Voter ID (required in some cases, see the confidence-score rule below)
  • Proof that you own the property or have the right to use the roof
  • Photos of the roof or site, if your vendor or DISCOM asks for them

The process in short

The full process has six stages: register on the portal, get DISCOM feasibility approval, install through a registered vendor, apply for net metering, pass inspection to get your commissioning certificate, and then upload your bank details to receive the subsidy.

The subsidy is credited after all of this is done. Official-style guides say about 30 days, but many applicants report 1–3 months, so do not leave the last steps until March.

For every screen and field, follow our step-by-step PM Surya Ghar application guide.

Plan backwards from the deadline

With 159 days left on 23 October 2026, work backwards from 31 March 2027. Approvals, inspections and net metering are where most delays happen, so do not leave them to the last month.

Target date What to finish
By 31 Oct 2026 Register on the portal, check your bills and roof, and decide your system size
By 15 Nov 2026 Collect 2–3 quotes and run them through the solar quote checker
By 30 Nov 2026 Finalise the vendor, get feasibility approval and sign a written agreement with a commissioning date
By 31 Dec 2026 Installation complete, net-meter application submitted
January 2027 DISCOM inspection, net meter fitted, commissioning certificate issued
February 2027 Buffer for delays, plus bank details and subsidy claim submitted
31 Mar 2027 Official closing date. Do not plan to be finishing then.

As the deadline nears, installers get busier and approvals slow down. Starting early gives you better choice of installers and more negotiating power.

The new 70% confidence-score rule

The portal has posted an announcement for all stakeholders. With effect from 3 September 2026, applications submitted on the portal with a confidence score below 70% are not redeemed directly.

For these applications, the consumer must:

  1. Download the prescribed undertaking from the portal.
  2. Fill it in and sign it.
  3. Upload it together with a valid Government of India name proof (Aadhaar, Voter ID, etc.).

Compliance is mandatory for smooth and timely processing. Ask your installer whether your application is affected, and do this early so it does not delay your subsidy near the deadline.

Loans, state top-ups and housing societies

Loans

The scheme is backed by low-interest, collateral-free loans for residential rooftop solar. Official material mentions an interest rate of around 7% for systems up to 3 kW. Terms vary by bank, so confirm the current rate, tenure and eligibility with the lender before you commit.

State top-up subsidies

In many states you can claim a state subsidy in addition to the central subsidy, and some states offer extra incentives. Rules and amounts change often, so check your state renewable energy agency or DISCOM website and ask your registered vendor what applies to you. State schemes may have their own deadlines, which can differ from the central one.

Housing societies and apartments

Residential welfare associations and group housing societies can also get central support for shared rooftop systems on common areas. Reported figures are about ₹18,000 per kW for installations up to 500 kW. The society typically needs to be legally registered, pass a resolution to install the system, and have proof of roof rights and a project report. If you live in an apartment, ask your society committee about this route. Confirm current terms on the official portal.

Model Solar Village

The scheme also includes a Model Solar Village component: one village per district can receive a ₹1 crore grant based on renewable energy capacity. This is for villages and local bodies, not individual households.

Will the scheme be extended?

One trade magazine has reported that a 3–4 month extension and a successor scheme (with focus on rural areas, batteries and financing) are being discussed. None of this is confirmed, and the official portal still shows 31 March 2027.

Think about it as three possible outcomes:

  • No extension: you must be done by 31 March 2027 or lose the subsidy.
  • Short extension: you gain extra time, but it is not guaranteed.
  • Successor scheme: details, subsidy amounts and eligibility are unknown and may be less generous.

If you act now, you are protected in all three cases. If you wait for an announcement, you only gain if an extension happens, and you risk losing ₹78,000 if it does not.

Mistakes that can cost you the subsidy

  • Waiting for an extension. It is unconfirmed, so do not plan around it.
  • Treating the deadline as the application date only. Plan for commissioning.
  • Paying a large advance without a written commissioning date. Read our guide on vendor scams and installation delays before you pay anything.
  • Using non-approved panels or an unregistered vendor.
  • Ignoring the confidence-score rule and missing the undertaking and ID upload.
  • Mismatched details. Name, consumer number or bank account that do not match your documents can delay or block payment.
  • Skipping the net-meter application until the last minute.
  • Not keeping records. Save your application number, commissioning certificate and payment receipts.

Questions to ask your installer

Ask these before paying any advance. For more red flags, see our guide on PM Surya Ghar vendor scams and delays:

  • Can you commission my system well before 31 March 2027? What is the date in writing?
  • What happens to my subsidy if commissioning is delayed past the closing date?
  • Which panel brand, inverter and warranty are included in the quote?
  • Who handles net metering, DISCOM inspection and portal paperwork?
  • Is my application affected by the 70% confidence-score rule?
  • Is there any extra state subsidy I can claim?

Frequently asked questions

When is the last date for PM Surya Ghar subsidy?

The official portal states that the scheme closes on 31 March 2027. It shows a live countdown on its homepage.

Is the PM Surya Ghar subsidy ending in March 2027?

Yes, according to the official portal the scheme closes on 31 March 2027. No official extension or successor scheme has been announced.

Is the subsidy still available now?

Yes. As of 23 October 2026 the central subsidy of up to ₹78,000 is still available, and the portal reports more than 53 lakh rooftop installations so far.

Is the last date for applying or for installation?

The portal does not clearly say. Because the subsidy is paid only after installation, inspection and commissioning, plan to be fully commissioned before the closing date.

Will the PM Surya Ghar scheme be extended beyond March 2027?

An extension of 3–4 months has been reported by one trade magazine, but it is not confirmed. The official portal still shows 31 March 2027. Do not rely on an extension.

Will there be a new scheme after PM Surya Ghar?

A successor scheme has been mentioned in reports, but there are no official details yet.

How much subsidy do I get?

₹30,000 for a 1 kW system, ₹60,000 for 2 kW and up to ₹78,000 for 3 kW and above.

How long does it take to get the subsidy after installation?

Guides say the subsidy is credited within about 30 days of completing the process, but many applicants report 1–3 months. Upload your bank details as soon as you receive the commissioning certificate.

What documents do I need?

Your electricity consumer number, mobile number, email, bank details with a cancelled cheque, and property or roof proof. You may also need a government ID (Aadhaar or Voter ID) if your application is affected by the confidence-score rule.

What is the 70% confidence-score rule?

From 3 September 2026, applications with a confidence score below 70% are not redeemed directly. The consumer must download the prescribed undertaking, sign it and upload it with a valid government name proof.

Can I get both central and state subsidy?

In many states, yes. Some states offer additional top-ups. Check your state’s current policy or ask a local registered installer.

Can I get a loan for rooftop solar under this scheme?

Yes. Low-interest, collateral-free loans are available through banks, with an interest rate of around 7% mentioned in official material for systems up to 3 kW. Check current terms with your bank.

Can a housing society or apartment get the subsidy?

Housing societies and RWAs can get support for shared rooftop systems on common areas, reported at about ₹18,000 per kW for up to 500 kW. Confirm the current rules on the official portal.

Should I install solar now or wait?

If you already plan to go solar, do it now. Waiting gains you little if the scheme is extended and costs you up to ₹78,000 if it is not.

Sources

Rules can change. Always verify the latest information on the official website: pmsuryaghar.gov.in

How we check our numbers: see our methodology.